New bathtub installation
Posted: Sun Sep 27, 2009 11:41 am
Installed new bathtub ordered from PPL Motor Homes stock #88-4143 32x24 step r hand drain which Lyons Industries is the manufacturer #DT1832STR12 for $122.
1. Took out old tub which is 1/2" longer (32 1/2"). Tub in corner by front drain had developed cracks. Thickness of original very thin and soft vinyl.
2. There was no leakage caught it in time so all wood supporting tub in good shape.
3. Installed new sideboard in hole left open by Airstream.
4. New tub is reinforced fiberglass. Very strong to support weight.
5. Installed/glued 4x4 posts under tub platform to support new tub better
6. These were adjusted in height to allow for small difference in depth of tub
7. Reinstalled tub platform, check drain placement and height
8. Installed tub, checked level, installed drain, secured to walls, caulked.
9. Made border out of Trex to cover screws, protect for leakage and added 1/2" to back panel to make up for being short. Glued to walls and will caulk when dry
Pictures on my gallery gingfred b190
Took about 3 hours with my son and son-in-law
Very happy with new strong tub
1. Took out old tub which is 1/2" longer (32 1/2"). Tub in corner by front drain had developed cracks. Thickness of original very thin and soft vinyl.
2. There was no leakage caught it in time so all wood supporting tub in good shape.
3. Installed new sideboard in hole left open by Airstream.
4. New tub is reinforced fiberglass. Very strong to support weight.
5. Installed/glued 4x4 posts under tub platform to support new tub better
6. These were adjusted in height to allow for small difference in depth of tub
7. Reinstalled tub platform, check drain placement and height
8. Installed tub, checked level, installed drain, secured to walls, caulked.
9. Made border out of Trex to cover screws, protect for leakage and added 1/2" to back panel to make up for being short. Glued to walls and will caulk when dry
Pictures on my gallery gingfred b190
Took about 3 hours with my son and son-in-law
Very happy with new strong tub